header pressearchiv postit en

Archive 2012

Stage Tec Celebrate Topping Out Ceremony

Download

download rtf-document: english 394 KB
download photos:  892 KB, 759 KB, 828 KB, 920 MB (rgb, zip)

20102 11-stagetec-richtfest1

20102 11-stagetec-richtfest2 

20102 11-stagetec-richtfest3 

20102 11-stagetec-richtfest4

Press Contact

SALZBRENNER STAGETEC MEDIAGROUP
Stefani Renner/Christoph Lieck
Industriegebiet See
D-96155 Buttenheim
Phone: +49 9545 440-167 / -168
Fax:+49 9545 440-111
This email address is being protected from spambots. You need JavaScript enabled to view it.
www.stagetec.com

Berlin, Thursday, 8th of November 2012: “... I propose a toast to this building. May it stand firm forever!” These were the closing words of the master carpenter’s speech at the topping out ceremony for Stage Tec’s new building by the Spree river. The structural shell of the new extension was completed just in time to avoid the start of the cold winter season.
From the second half of 2013, the new space will be home to the production and customer service departments including test-engineering and metrology. It will provide significantly larger production and storage space for the various product lines as well as comprehensively equipped inspection and test facilities and a large conference room for training purposes. The development section, which has increased in size significantly in recent years, will remain in the existing part of the complex. With a total floor space of 4,100 square meters, which corresponds to a doubling of the current area, the new suite of buildings will offer plenty of possibilities for further expansion in the future.